Royal Mail Sorting Centre, Croydon
The existing steel loading bay had become polished and slippery over
time the clients need was to provide a hard wearing slip resistant surface
in the shortest possible time frame.
During the course of a Saturday the deck was cleaned and prepared by
blast track machine and Metflex CA SL flooring system applied at 2m
thickness encapsulating quartz aggregate to provide slip resistance. The
surface was finished in dark grey with a yellow demarcation band.
Works were completed in one operation lasting approximately 7 hours
with the loading area returned to full service immediately upon completion
of works.
|